Professional Development: Driving the Economic Engine
These days it seems that our economic engine is running just a bit ragged. Generally, it is performing fairly well, but we can’t seem to get the ultra-smooth, high-speed performance that we would like. It sputters a bit every now and then. Just when it looks like it is going to take off, it coughs or hiccups, and slows down before catching and starting back up again. When one considers that technology and innovation have produced many significant improvements in recent years, the question is raised as to why our economic engine isn’t racing along. Why haven’t these improvements in components and machines and processes and systems caused our economic engine to accelerate to a smooth purring ride? Could the lack of professional development be a factor?
There are numerous issues influencing our economic engine-many real, many politic, and many mysterious. We could discuss capital formation problems, balance of trade politics, over-wary management, and so on. However, I want to focus on the part that professional development plays in this scenario. And more importantly-the role that professional development will play in the future performance of our economic engine.
As said above, our engine is running fairly well now, albeit with some fits and starts. While we are not at peak performance, we are certainly not in a crisis mode. Our industry is generally running well. I think this is true despite a real shortfall in professional development over the past few years.
Training budgets have been reduced as cost competition has driven companies to cut budgets. People resources also have been reduced due to tightened budgets. However, we have been blessed with a solid core of professionals throughout the ranks who carried on despite the reduced budgets and resources.
From crafts and technicians through engineers, supervisors, and managers, a tremendous wealth of knowledge and experience has generally seen us through the past few years despite limited resources. Although we have utilized them somewhat to our benefit, we probably have not taken full advantage of the recent innovations and other technical advances available to us.
Looking ahead, I see a crisis looming as our knowledgeable, experienced, and talented workforce leaves the workplace and is replaced by not-so-knowledgeable, much-less-experienced, and talented (yes, these new folks are talented) individuals. All the studies I see indicate that a massive migration of our workforce is going to happen over the next few years. Demographic studies indicate that more than 50 percent of the workforce can retire within the next few years. There is little question that our economic engine is going to be hit with some real changes and challenges.
While this experience migration “problem” (make that “challenge”) has many facets, and will require many necessary resolution approaches, I suggest that a major strategy is to embrace and drive professional development. From the crafts to the managers, the need for continuing professional development (or life-long learning) will become more and more critical.
Technology and innovation will continue to advance the science of how we do things. Globalization will continue to affect the way we operate our industries. Cultural and societal issues will continue to alter the way we manage our businesses. Our up-and-coming workforce will need to continuously develop and hone their skills-technical and managerial.
This calls for well-thought-out professional development strategies and plans. This calls for increased attention and commitment to professional development by individuals and organizations alike. This calls for utilization of new means of knowledge delivery (such as Internet delivery, interactive CDs, etc.). This calls for a development strategy that includes specific knowledge areas for each and all facets of the organization-crafts to managers.
Just as we keep our automobile engines in tune so we obtain the smooth, high-performance ride we crave, we need to pay attention to our economic engine to also receive the smooth, high-performance ride we crave. We wouldn’t take our new auto to the old, out-of-touch mechanic who worked on cars in the 1960s. We would insist on a mechanic who had been educated and trained on today’s engines. Should we do less for our economic engines-the ones that drive our livelihoods?
Related Articles
Expert troubleshooters have a good understanding of the operation of electrical components that are used in circuits they are familiar with, and even ones they are not. They use a system or approach that allows them to logically and systematically analyze a circuit and determine exactly what is wrong. They also understand and effectively use tools such as prints, diagrams and test instruments to identify defective components. Finally, they have had the opportunity to develop and refine their troubleshooting skills.
Expert troubleshooters have a good understanding of the operation of electrical components that are used in circuits they are familiar with, and even ones they are not. They use a system or approach that allows them to logically and systematically analyze a circuit and determine exactly what is wrong. They also understand and effectively use tools such as prints, diagrams and test instruments to identify defective components. Finally, they have had the opportunity to develop and refine their troubleshooting skills.
See More
Semiconductor devices are almost always part of a larger, more complex piece of electronic equipment. These devices operate in concert with other circuit elements and are subject to system, subsystem and environmental influences. When equipment fails in the field or on the shop floor, technicians usually begin their evaluations with the unit's smallest, most easily replaceable module or subsystem. The subsystem is then sent to a lab, where technicians troubleshoot the problem to an individual component, which is then removed--often with less-than-controlled thermal, mechanical and electrical stresses--and submitted to a laboratory for analysis. Although this isn't the optimal failure analysis path, it is generally what actually happens.
Semiconductor devices are almost always part of a larger, more complex piece of electronic equipment. These devices operate in concert with other circuit elements and are subject to system, subsystem and environmental influences. When equipment fails in the field or on the shop floor, technicians usually begin their evaluations with the unit's smallest, most easily replaceable module or subsystem. The subsystem is then sent to a lab, where technicians troubleshoot the problem to an individual component, which is then removed--often with less-than-controlled thermal, mechanical and electrical stresses--and submitted to a laboratory for analysis. Although this isn't the optimal failure analysis path, it is generally what actually happens.
See More
In an ideal world, multiple components could be produced in a single piece, or coupled and installed in perfect alignment. However, in the real world, separate components must be brought together and connected onsite. Couplings are required to transmit rotational forces (torque) between two lengths of shaft, and despite the most rigorous attempts, alignment is never perfect. To maximize the life of components such as bearings and shafts, flexibility must be built in to absorb the residual misalignment that remains after all possible adjustments are made. Proper lubrication of couplings is critical to their performance.
In an ideal world, multiple components could be produced in a single piece, or coupled and installed in perfect alignment. However, in the real world, separate components must be brought together and connected onsite. Couplings are required to transmit rotational forces (torque) between two lengths of shaft, and despite the most rigorous attempts, alignment is never perfect. To maximize the life of components such as bearings and shafts, flexibility must be built in to absorb the residual misalignment that remains after all possible adjustments are made. Proper lubrication of couplings is critical to their performance.
See More
The key to realizing greater savings from more informed management decisions is to predetermine the "True" cost of downtime for each profit center category. True downtime cost is a methodology of analyzing all cost factors associated with downtime, and using this information for cost justification and day to day management decisions. Most likely, this data is already being collected in your facility, and need only be consolidated and organized according to the true downtime cost guidelines.
The key to realizing greater savings from more informed management decisions is to predetermine the "True" cost of downtime for each profit center category. True downtime cost is a methodology of analyzing all cost factors associated with downtime, and using this information for cost justification and day to day management decisions. Most likely, this data is already being collected in your facility, and need only be consolidated and organized according to the true downtime cost guidelines.
See More
I use the term RCPE because it is a waste of good initiatives and time to only find the root cause of a problem, but not fixing it. I like to use the word problem; a more common terminology is Root Cause Failure Analysis (RCFA), instead of failure because the word failure often leads to a focus on equipment and maintenance. The word problem includes all operational, quality, speed, high costs and other losses. To eliminate problems is a joint responsibility between operations, maintenance and engineering.
I use the term RCPE because it is a waste of good initiatives and time to only find the root cause of a problem, but not fixing it. I like to use the word problem; a more common terminology is Root Cause Failure Analysis (RCFA), instead of failure because the word failure often leads to a focus on equipment and maintenance. The word problem includes all operational, quality, speed, high costs and other losses. To eliminate problems is a joint responsibility between operations, maintenance and engineering.
See More
The potential-to-functional failure interval (P-F interval) is one of the most important concepts when it comes to performing Reliability-Centered Maintenance (RCM). Remarkably, the P-F interval is also one of the most misunderstood RCM concepts. The failure mode analysis becomes even more complicated when you are dealing with several P-F intervals for one failure mode. This paper will help clarify the P-F interval and the decision-making process when dealing with multiple P-F intervals.
The potential-to-functional failure interval (P-F interval) is one of the most important concepts when it comes to performing Reliability-Centered Maintenance (RCM). Remarkably, the P-F interval is also one of the most misunderstood RCM concepts. The failure mode analysis becomes even more complicated when you are dealing with several P-F intervals for one failure mode. This paper will help clarify the P-F interval and the decision-making process when dealing with multiple P-F intervals.
See More
As many of us strive to improve the reliability of our plants, several comments bemoan how challenging that is to do in an era of continuous deep cost cutting. They say that in their operation, maintenance is seen as a cost, and is one of the first things to arbitrarily cut. Some think their operations have cut too far! What they seek is a way to justify a strong maintenance capability. I submit that one approach is to speak of maintenance as an “investment in capacity.” Use the language that plant managers, controllers and senior management understands: capital investment and return on investment (ROI).
As many of us strive to improve the reliability of our plants, several comments bemoan how challenging that is to do in an era of continuous deep cost cutting. They say that in their operation, maintenance is seen as a cost, and is one of the first things to arbitrarily cut. Some think their operations have cut too far! What they seek is a way to justify a strong maintenance capability. I submit that one approach is to speak of maintenance as an “investment in capacity.” Use the language that plant managers, controllers and senior management understands: capital investment and return on investment (ROI).
See More