“Serialized” spare parts are repairable components, usually expensive and complex, where each individual item needs to be tracked and recorded to ensure reliability.
Serialized components are often in contact with the process and require refurbishing several times over their life span. The example I’ll use here are covered rolls used on a paper machine, such as the machine in the picture below.
Covered paper machine rolls have a steel or cast-iron core and a resilient cover. As the cover wears in service, it must be removed from the machine, surface-ground and returned to storage ready for re-use. When the cover reaches a minimum thickness, it must be sent to a specialist shop for re-covering.
There may be several rolls that are identical when new and they all should have the same material catalogue number. Each also needs a unique serial number that is used to keep a record of the cover thickness and condition. These rolls move through a cycle as illustrated below:
Paper machine rolls are an example of components that wear, there are a large number of them in various shapes and sizes and are absolutely critical to the operation. Being without a spare when it is needed will result in a very expensive extended shutdown. In a typical paper mill, the management of rolls is assigned to a very experienced Planner, or similar position.
While most popular maintenance computer systems have the functionality to manage serialized repairable spare parts, it is not uncommon to find that the system is not used for this purpose. In fact, rolls may be managed completely outside the maintenance inventory process. This could be because:
– users have not been trained to use the serial-tracking process
– the process is too complex
– the system functionality does not support the specialized detailed condition reports required
– the system security does not protect condition-tracking information from unauthorized changes
– users have been through one change in maintenance software, have lost critical information and don’t want to be caught again
– the system, generally, is not trusted to manage critical components
or more than one of the above.
As a results, roll records are often found on personal computers or in an independent “roll-tracking” system.
If you have components that require serial tracking, the five concerns listed above should be reviewed in detail with your maintenance software supplier, preferably prior to purchase, with the goal of keeping all critical maintenance data in the same system.
Assigning serial numbers to repairable components should not be used to compensate for reliability problems. For example, I have seen pump rotating assemblies with serial numbers so that “rogue” components (that have a shorter operating life than others) can be tracked. Serial tracking is a significant administrative load and it is far better to put this effort into eliminating these kinds of unreliable components by identifying root causes and eliminating them, usually through better repair procedures.
Don Armstrong
Don Armstrong is the President of Veleda Services – Maintenance Management Consulting and Training. Don is an experienced professional engineer and has managed a number of large maintenance departments over the years. In addition, he has successfully instituted new planning and scheduling processes, maintenance standards, and safety programs into maintenance departments.
This article covers the two main plant numbering systems that together form the framework on which all maintenance programmes are based and describes the value that can be created by integrating these identification systems. These two systems are: Equipment Numbers, or more accurately, Equipment Location Numbers Stock-Keeping Unit (SKU) numbers or, preferably, Material Catalogue Numbers. A third, less critical but still important numbering system for Stores location (or “bin”) numbers, is also included.
This article covers the two main plant numbering systems that together form the framework on which all maintenance programmes are based and describes the value that can be created by integrating these identification systems. These two systems are: Equipment Numbers, or more accurately, Equipment Location Numbers Stock-Keeping Unit (SKU) numbers or, preferably, Material Catalogue Numbers. A third, less critical but still important numbering system for Stores location (or “bin”) numbers, is also included.
As a part of a reliability improvement programme, many process industries assign the losses resulting from each downtime or lost production event to the department “responsible” – usually operations, mechanical or electrical (and perhaps others). Frequently this allocation is based on someone’s perception of who is to blame, which can have significant negative effects.
As a part of a reliability improvement programme, many process industries assign the losses resulting from each downtime or lost production event to the department “responsible” – usually operations, mechanical or electrical (and perhaps others). Frequently this allocation is based on someone’s perception of who is to blame, which can have significant negative effects.
In any organization there are many departments that must work closely with other departments. One vital partnership is maintenance and the maintenance storeroom – nothing is more important than getting the right parts at the right time to achieve a high level of maintenance effectiveness. While this partnership is vital, it is difficult to develop and maintain because it requires a high level of discipline and determination by both parties. This article covers the dual responsibilities required to achieve success.
In any organization there are many departments that must work closely with other departments. One vital partnership is maintenance and the maintenance storeroom – nothing is more important than getting the right parts at the right time to achieve a high level of maintenance effectiveness. While this partnership is vital, it is difficult to develop and maintain because it requires a high level of discipline and determination by both parties. This article covers the dual responsibilities required to achieve success.
An essential part of a complete business process for managing a maintenance storeroom is a robust and simple procedure for returning materials to stores. The components of this procedure should meet the following requirements: It must be simple, take into account that some parts that are issued from stores will be returned, ensure that returned parts are fit for service, and returned parts must be complete.
An essential part of a complete business process for managing a maintenance storeroom is a robust and simple procedure for returning materials to stores. The components of this procedure should meet the following requirements: It must be simple, take into account that some parts that are issued from stores will be returned, ensure that returned parts are fit for service, and returned parts must be complete.
“Repairable” spares (sometimes called “rotating” or “rotable” spares) are parts or assemblies that are carried in the Maintenance storeroom and which are not automatically re-ordered when they are issued. They rotate through a cycle that includes in-service in operating equipment, then to a repair shop, then to inventory and then back to service.
“Repairable” spares (sometimes called “rotating” or “rotable” spares) are parts or assemblies that are carried in the Maintenance storeroom and which are not automatically re-ordered when they are issued. They rotate through a cycle that includes in-service in operating equipment, then to a repair shop, then to inventory and then back to service.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nullam rhoncus, odio eget elementum volutpat, enim risus vulputate mauris, et luctus augue massa et sapien. Lorem ipsum dolor sit amet, consectetur adipiscing elit. In efficitur mi in erat lacinia tincidunt. Cras vulputate nec nulla vitae pretium. Integer porttitor mattis justo at fringilla. Donec eleifend massa turpis, at auctor mi pulvinar sit amet. Cras ut turpis id arcu fringilla gravida.