Maintenance Cost Reduction
Christer Idhammar, IDCON INC
In my earlier column I wrote about the Fox versus the Hedgehog approach. That column was also published in an electronic newsletter and included in the weekly poll. The poll results show that only 16.7% of all respondents thought their company was a hedgehog company. The rest viewed themselves as Fox or a mix of Fox and Hedgehog organizations.
This means that most organizations take a short-term approach to maintenance cost reduction and savings which in the long term will be very costly. I frequently see examples on this in organizations I work with. One common example is that maintenance cost reduction initiatives almost entirely focus on visible cost reductions while waste built into the day to day work system are overlooked or ignored.
Let me give some examples, I hope you do not recognize any of them, but if you do, do not believe you are alone in doing so.
It is not at all uncommon that operations and maintenance shutdown schedules are wide open until the morning of the shut down.
So the following can be a common phenomenon:
A shutdown of an area is preliminary estimated to require ten hours, if all necessary work is to be completed.
First step to save money is to cut the shutdown to eight hours, so some work must be postponed, because to bring in more contractors to complete all work will cost too much visible money.
“Perhaps we can run the three rotary steam joints until next shutdown, they do not yet leak. We know that the carbon rings in these joints only have about 1/8” thickness left but we take the risk” is one suggestion, so these jobs are cancelled along with some other work deemed as not urgently needed.
During the shutdown the operations manager added three jobs that had been forgotten and was therefore not put on the maintenance schedule before the shut down. This delayed the start up by three hours.
The coupling for one dryer section drive was to be replaced.
After pulling the coupling off the shaft it was discovered that the coupling was not requested from the store and when it was found it was not prepared to the right shaft diameter, nor did the key way fit.
This was one of the last jobs, so no time was given to prepare coupling properly. The old coupling was put back and welded together to be fixed right later.
At start up the steam system was started too fast resulting in a lot of water hammer in pipe systems.
A consequence was that two of the three carbon rings in the rotary steam joints cracked and the joints started to leak. They could be shut off but this would result in a 10% slowdown of production speed.
Also the cost of repairing the joints went up by 10 times because of the damaged seal surfaces. The coupling lasted through the startup, but was forgotten and three months and three shutdowns later, the bearings in both the motor and gearbox failed. The welded coupling was too stiff and also misaligned.
This caused six hours of unscheduled lost production and additional maintenance costs.
The root of the above examples of waste is poor discipline in prioritization of work, lack of closing time for shut down schedules, too easy to add on a job even during a shut down, lack of planning of work etc.
But it has always been this way in this organization so the waste is known and accepted.
Summary: Maintenance Cost Reduction
The fix to the problem will take time, because it includes a cultural change. “Right now we have to save what we can in the short term so we do not have time to deal with this now, and on top of that it will cost money to improve our work system” is a common saying in this organization.
The time and cost to improve is visible cost, the existing waste is embedded in the work system and invisible. Instead of improving long term and saving long term waste, the visible short term cost saving initiatives takes over.
For example: Cancellation of training programs, reduction of number of planners and supervisors, postponing needed maintenance work, reduction of lubricators and handing this important task to operators without training, etc.
It is understandable that costs must be reduced, this is needed to survive, but the industry can no longer count on the next big upswing to afford the cost of short-term saving initiatives. So, in this new market, plants, mills, and mines must take on long-term improvement initiatives. The short-term savings will often worsen the situation within three to five years. A long-term cultural change initiative will improve performance substantially in three to five years.
Related Articles
Whether it is a Greenfield capital expansion project, existing plant expansion or the replacement of existing installed equipment, sooner rather than later, you will need an asset maintenance strategy to support your production uptime targets. The longer you wait, the more expensive it becomes.
Whether it is a Greenfield capital expansion project, existing plant expansion or the replacement of existing installed equipment, sooner rather than later, you will need an asset maintenance strategy to support your production uptime targets. The longer you wait, the more expensive it becomes.
See More
The last of the ‘baby boomer’ generation are now retiring from the workplace. As they walk out of the door of your business for the last time, they are taking with them a lifetime's experience from old-school apprenticeship programmes to a lifetime of fault diagnosis and learning in the ‘university of life.’ That experience is what helped your business grow, become successful, and kept your customers happy and returning with repeat orders! So, what can be achieved in the time before valued employees retire for knowledge capture and knowledge transfer so your business can maintain momentum?
The last of the ‘baby boomer’ generation are now retiring from the workplace. As they walk out of the door of your business for the last time, they are taking with them a lifetime's experience from old-school apprenticeship programmes to a lifetime of fault diagnosis and learning in the ‘university of life.’ That experience is what helped your business grow, become successful, and kept your customers happy and returning with repeat orders! So, what can be achieved in the time before valued employees retire for knowledge capture and knowledge transfer so your business can maintain momentum?
See More
You are probably familiar with life’s golden rule: Do unto others as you would have them do unto you. But have you ever wondered how any given machine, if it could express itself, would feel about this rule? What would it say? This article offers some speculative thoughts from the machine’s point of view, presented as the golden rules for machinery reliability.
You are probably familiar with life’s golden rule: Do unto others as you would have them do unto you. But have you ever wondered how any given machine, if it could express itself, would feel about this rule? What would it say? This article offers some speculative thoughts from the machine’s point of view, presented as the golden rules for machinery reliability.
See More
Even when a company has both the will and the money to spend, it is difficult to know where to start when considering the implementation of maintenance management systems. Probably the majority of smaller companies are still at this stage, which effectively means the majority of maintenance people. The prospect of developing suitable maintenance control strategies and policies from a standing start is daunting. There are many questions such as how much will it cost, where will the resources come from and how will we cope?
Even when a company has both the will and the money to spend, it is difficult to know where to start when considering the implementation of maintenance management systems. Probably the majority of smaller companies are still at this stage, which effectively means the majority of maintenance people. The prospect of developing suitable maintenance control strategies and policies from a standing start is daunting. There are many questions such as how much will it cost, where will the resources come from and how will we cope?
See More
Organizations that are predominantly reactive typically do not believe it is possible to perform work any other way. Overall, they are frustrated, which in turn impacts morale. Maybe it is a training issue or maybe it is a leadership issue. Either way, it is affecting worker productivity due to the majority of work being unplanned. Unscheduled work also affects job safety. When workers feel rushed, bad things happen. Lastly, those organizations with poor reliability typically waste 10 percent of their revenue.
Organizations that are predominantly reactive typically do not believe it is possible to perform work any other way. Overall, they are frustrated, which in turn impacts morale. Maybe it is a training issue or maybe it is a leadership issue. Either way, it is affecting worker productivity due to the majority of work being unplanned. Unscheduled work also affects job safety. When workers feel rushed, bad things happen. Lastly, those organizations with poor reliability typically waste 10 percent of their revenue.
See More
There are several important silent assumptions of bearing reliability. However, before I address these assumptions, some even more basic assumptions and statements of fact must be established. While it might be a bit of a leap, I'm going to assume that the bearing is well-designed, well-manufactured, properly handled and stored, and finally, correctly selected for the intended application. With that said, we're now ready to talk about those silent assumptions that are in the maintenance function's domain.
There are several important silent assumptions of bearing reliability. However, before I address these assumptions, some even more basic assumptions and statements of fact must be established. While it might be a bit of a leap, I'm going to assume that the bearing is well-designed, well-manufactured, properly handled and stored, and finally, correctly selected for the intended application. With that said, we're now ready to talk about those silent assumptions that are in the maintenance function's domain.
See More